HMCS PROTECTEUR 520

 

Protecteur Class Joint Support Ship

 


 

 

Laid Down: 16 Jan 2020, Seaspan Shipyard, Vancouver, BC

Floated up:   21 Dec 2024, Seaspan Shipyard, Vancouver, BC

Commissioned: 

Paid off: 

 

Once completed, it will feature a length of 173.7 meters and a width of 24 meters. HMCS PROTECTEUR will have a cruising speed of 15 knots, a top speed of 20 knots and a range of ~10,800 nautical miles.

 

This joint support ship (JSS) is a multi-role naval ship capable of launching and supporting “joint” amphibious operations. It also provides sea-lift, underway support, sea-basing and logistics capabilities for combined army and naval missions.

 

Estimated to be completed in 2025

 

Photos and Documents

 

The future HMCS PROTECTEUR is being moved on to a submersible barge in preparation for her floating up.

Source: Seaspan ULC facebook page 11 Dec 2024

 


 

  

The barge holding the future HMCS PROTECTEUR being moved in preparation for floating up.

Photos courtesy of Albert Riopel

 


 

 

     

The Naming Ceremony for the future HMCS PROTECTEUR 520 - 13 Dec 2024

Photographer: S3 Jordan Schilstra

Source: RCN Official Facebook page

 


 

The future HMCS PROTECTEUR 520 after floating up at Vancouver, BC - 21 Dec 2024

Source: Seaspan facebook page

 


 

An evening photo of the future HMCS PROTECTEUR 520 at Seaspan in Vancouver, BC shortly after floating up

Photographer unknown.  This photo was email to me - it came from a facebook post.  The group it was posted in not known.  It would be appreciated if the photographer would contact me at info@forposterityssake.ca

 


 

HOME PAGE     SHIP INDEX      CONTACT